工地鋼筋加工棚搭建要注意什么?

來源:http://www.antsf.com/   發(fā)布時(shí)間:2022-01-11

1、工地鋼筋加工棚搭設(shè)規(guī)范:

1. Specification for erection of reinforcement processing shed on site:
鋼筋加工棚是施工現(xiàn)場(chǎng)內(nèi)對(duì)鋼筋進(jìn)行拉直、彎曲、焊接等鋼筋加工作業(yè)的一個(gè)場(chǎng)地。鋼筋加工棚的長(zhǎng)和寬,一般會(huì)根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6*12m、9*12m、18*30m等幾種,可以根據(jù)施工實(shí)際情況,自行設(shè)計(jì)長(zhǎng)與寬尺寸。鋼筋加工棚工作臺(tái)的布置也要合理,根據(jù)真實(shí)鋼筋加工流程來,還有加工前原材料鋼筋和加工結(jié)束后成品的存放,所以鋼筋加工棚的地面應(yīng)高于施工場(chǎng)地地面30cm,防止雨水浸泡,用腳手管進(jìn)行搭設(shè)時(shí),應(yīng)有地橫桿和斜撐,以保證加工棚的穩(wěn)定性。
The reinforcement processing shed is a site for straightening, bending, welding and other reinforcement processing operations on the construction site. The length and width of the reinforcement processing shed are generally determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6 * 12M, 9 * 12M, 18 * 30m and so on. The length and width can be designed according to the actual construction situation. The layout of the worktable of the reinforcement processing shed shall also be reasonable. According to the real reinforcement processing process, as well as the storage of raw materials and finished products before processing, the ground of the reinforcement processing shed shall be 30cm higher than the ground of the construction site to prevent rainwater immersion. When erecting with scaffold pipes, there shall be ground cross bars and diagonal braces to ensure the stability of the processing shed.
2、工地鋼筋加工棚搭建細(xì)節(jié):
2. Construction details of reinforcement processing shed on site:
埃歐哲鋼筋加工棚采用國(guó)際標(biāo)準(zhǔn)鋼材制作,在現(xiàn)場(chǎng)利用扣件將多根鋼管扣接搭設(shè)成加工棚的整體式鋼結(jié)構(gòu),再設(shè)置斜撐和雙層防砸結(jié)構(gòu),校驗(yàn)鋼結(jié)構(gòu)強(qiáng)度是否符合設(shè)計(jì)要求,在欄桿上鉤掛標(biāo)語橫幅,整個(gè)鋼筋加工棚施工完畢標(biāo)準(zhǔn)化設(shè)計(jì)。全拼裝式,快速組裝,拆卸簡(jiǎn)單,方便運(yùn)輸,型材及配件規(guī)格可按需求來定制。同時(shí)地面也需要硬化,立柱基礎(chǔ)澆筑700*700*700mm混凝土,預(yù)埋300*300*12mm鋼板。
The eozhe reinforcement processing shed is made of international standard steel. Firstly, multiple steel pipes are buckled and erected on site to form an integral steel structure of the processing shed, and then diagonal bracing and double-layer anti smashing structure are set to verify whether the strength of the steel structure meets the design requirements. Safety slogans and banners are hung on the railings. The construction of the whole reinforcement processing shed is completed and standardized. Full assembly, quick assembly, simple disassembly and convenient transportation. The specifications of profiles and accessories can be customized according to demand. At the same time, the ground also needs to be hardened. The column foundation is poured with 700 * 700 * 700mm concrete and embedded with 300 * 300 * 12mm steel plate.
木工加工棚
3、工地鋼筋加工棚需注意事項(xiàng):
3. Precautions for site reinforcement processing shed:
1.一般情況下,鋼筋加工棚都在塔吊的吊運(yùn)范圍內(nèi),否則鋼筋吊動(dòng)不方便,同時(shí)必須設(shè)置雙層硬質(zhì)防護(hù),棚的具體尺寸要根據(jù)實(shí)際情況來定。
1. Generally, the reinforcement processing shed is within the lifting range of the tower crane, otherwise it is inconvenient to lift the reinforcement. At the same time, double-layer hard protection must be set, and the specific size of the shed shall be determined according to the actual situation.
2.防護(hù)棚的頂有二層的,上面的隔層上鋪模板,下面一層鋪二層竹芭片子,二層之間間距500 mm。
2. If there are two layers on the top of the protective shed, the upper compartment is paved with formwork, and the lower layer is paved with two layers of bamboo sheets, with a spacing of 500 mm between the two layers.
3.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌和宣傳用語的橫幅,圖牌的尺寸為:寬×高=2000mm×1000mm,橫幅寬度宜為1m。
3. The tool type reinforcement processing shed shall hang the operation specification drawing board and the banner of safety publicity language at an eye-catching place. The size of the drawing board is: width × Height = 2000mm × 1000mm, and the banner width should be 1m.
4.加工車間地面需硬化,宜選用砼地面。
4. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
5.內(nèi)部有滅火器、鋼筋加工設(shè)備、有照明系統(tǒng)
5. There are fire extinguishers, reinforcement processing equipment and lighting system inside
6.加工車間地面需硬化,宜選用砼地面。
6. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
7. 南方地區(qū),如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。
7. In case of typhoon in southern China, windproof measures shall be taken, and wind ropes can be set.
感謝您的閱讀,此文的文章來源:木工加工棚更多的內(nèi)容和問題請(qǐng)點(diǎn)擊:http://www.antsf.com我們會(huì)繼續(xù)努力的為您提供服務(wù),感謝您的支持!
Thank you for reading. The source of this article is woodworking shed. For more information and questions, please click: http://www.antsf.com We will continue to work hard to provide you with services. Thank you for your support!

几个农民工一起弄我舒服死了| 久久精品国产色蜜蜜麻豆国语版| 欧美肥胖老太玩黑人| 亚洲av无码色情第一综合网| 人妻妺妺窝人体色www聚色窝| 16表妺好紧没带套经过| 欧美日韩亚洲精品瑜伽裤| 亚洲熟妇无码一区二区三区导航| 狂性xxxx乱大交老女人| 极品新婚夜少妇真紧| 丰满老熟好大bbb| 日韩精品一区| 国产精品99久久久久久擦边| 少妇粉嫩小泬喷水视频www| 国产老熟妇精品观看| 梁医生不可以季亭亭梁衍| 99久久精品免费看国产| 人妻夜夜爽天天爽三区丁香花| 国产肥熟女视频一区二区| 人妻忍着娇喘被中进中出视频| 麻豆免费视频网站入口在线观看| 阿娇张开双腿实干十三分钟| 年轻的护士3韩国三级| 996久久国产精品线观看| 国产真实乱了露脸在线观看| 亚洲精品国产精品乱码视色| 无码人妻精品一区二区三区66| 欧美一区二区三区视频在线观看| 人妻夜夜爽天天爽三区麻豆av| 老熟女毛茸茸浓毛| 人妻激情偷乱视频一区二区三区| 亚洲精品久久久久久久蜜桃| 日本人真人姓交大视频| hkdoll玩偶在线无码国产| 日韩精品久久日日躁夜夜躁影视| 西瓜在线看免费观看视频| 里番acg里番成人本子| 男人呻吟双腿大开男男h漫画在线| 国产精品久久久久久精品| 丁香花视频在线观看完整版| 久久久久久久精品无码av少妇|