男男高潮(h)互攻,绝顶高潮合集videos,亚洲色综合狠狠综合区,对白荡伦系列之子你不能这样我

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關信息發(fā)布和相關資訊,敬請關注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.antsf.com/

地址:山東省濟南市章丘圣井工業(yè)園

當前位置: 首頁 > 新聞中心 > 公司新聞

通道及施工電梯防護棚要求要求

來源:http://www.antsf.com/   發(fā)布時間:2021-11-18

1塔吊半徑以內所有后臺制作加工、攪拌區(qū)必須搭設雙層防護棚。

1. All backstage fabrication, processing and mixing areas within the radius of tower crane must be provided with double-layer safety protection sheds.
2.操作場所掛設的標志牌有:機械驗收合格牌、警示牌、操作規(guī)程。標牌 的掛設高度為離地面 2.6 m標志牌規(guī)格為寬600mm*高800mm.
2. The signboards hung at the operation site include: Qualified Mechanical acceptance board, safety warning board and operation procedures. The hanging height of the sign is 2.6 m above the ground, and the specification of the sign is 600mm wide * 800mm high
3.地面必須進行砼硬化厚200mm,設置4L滅火器 2 只。開關箱與機械的水平 間距不得大于 3 m。
3. The ground must be hardened with concrete thickness of 200mm, and 2 4L fire extinguishers shall be set. The horizontal distance between the switch box and the machinery shall not be greater than 3 m.
4.雙層防護棚,兩層之間高度800mm,面層用噴繪布噴繪制成,正面為防護 棚名稱和標志牌,其余三面采 用警示標語。
4. The double-layer protective shed has a height of 800mm between the two layers. The surface layer is made of spray-painted cloth. The front side is the name of the protective shed and safety signs, and the other three sides are provided with safety warning slogans.
木工加工棚
5.加工棚名稱及標語字高為400mm,長度根據(jù)尺寸現(xiàn)場均勻布置。
5. The name of the processing shed and the safety slogan are 400mm high, and the length is evenly arranged on site according to the size.
6.標志牌:寬 400mm*高500mm
6. Safety signboard: 400mm wide * 500mm high
7.基礎施工前應先視現(xiàn)場地質情況做地基處理,處理方法可采用夯實、換填石 料等,必須保證其密實度
7. Before foundation construction, foundation treatment shall be carried out according to the site geological conditions. The treatment methods can be tamping, replacement of stones, etc., and its compactness must be ensured
8.立桿采用22#工字鋼立柱刷紅色油漆,每榀寬度5m,高3m。如施工現(xiàn)場場地不足,可以按5m每榀自行調整做法,但須經現(xiàn)場技術人員同意。
8. The vertical pole adopts 22# I-steel, and the column is painted with red paint. Each frame is 5m wide and 3M high. If the construction site is insufficient, the method can be adjusted according to 5M each frame, but it must be approved by the on-site technicians.
9.圖中標注為焊接的地方如無特殊說明的,均作滿焊處理 ,現(xiàn)場安裝前應對各 構件焊接質量進行驗收
9. The places marked as welding in the drawing shall be fully welded unless otherwise specified. The welding quality of each component shall be accepted before on-site installation
10.鋼筋加工機具應獨立配置開關箱,開關箱中心離地面高度為1.5m. 11.軟弱基礎及受臺風影響地區(qū)須增設拉錨。
10. Rebar processing machines and tools shall be equipped with switch box independently, and the height from the center of the switch box to the ground shall be 1.5m. 11. Pull anchors shall be added in weak foundation and typhoon affected areas.

国产女人18毛片水真多1| 欧美军警gay巨大粗长| 少妇养生馆spa私密精油按摩| 国精品人妻无码一区二区三区牛牛| 被绑在打桩机上抹春药| 亚洲欧美成人av在线观看| 国产在线观看国偷精品产拍| 在线永久看片免费的视频| 中文字幕一区二区三区四区五区| 国产娇小粉嫩学生免费网站| 亚洲一区域二区域三区域四区域| 挺进绝色校花的紧窄小肉| 久久久久亚洲av无码专区体验| 舌头伸进去添的我爽高潮| 强壮的公次次弄得我高潮a片日本| 精品无人妻一区二区三区| 征服同学人妇系列陈露露3| 亚洲人成网站999久久久综合| 成熟女人毛片www免费版在线| 久久碰人人玩国产精品| 久久亚洲av午夜福利精品一区| 亚洲精品乱码久久久久久蜜桃不卡| 我的邻居是bj无删减漫画免费看| 亚洲色精品三区二区一区| 久久久久亚洲av无码专区首jn| 天干天干天啪啪夜爽爽99| 97高清视频在线观看免费| 亚洲综合色一区二区三区| 老熟女重囗味hdxx70星空| 狠狠夜色午夜久久综合热| 国精产品一码二码三m| 精品一线二线三线精华液| 豪妇荡乳1一5全集| 亚洲国产精品无码专区| 办公室扒开奶罩揉吮奶头a片小说| 无码人妻精品一区二区三区9厂| 色94色欧美sute亚洲线路二| 欧美性xxxxx极品少妇小说| 无码人妻丰满熟妇啪啪欧美| 张柏芝用嘴给陈冠希高潮| av免费在线观看|